Phase II of the Master Planning Process is Complete!

 

Contact Us:
You can reach the project team by telephone at:

(540) 231-5487

or by e-mail at:
drbork@vt.edu



Established October 30, 2008 by the Lakewood Park Master Plan Project Team from the -

Landscape Architecture Program
School of Architecture + Design
College of Architecture and Urban Studies
Virginia Tech


Project Resources:

View the Introductory Slide Show
From the First Public Meeting
- October 29, 2008

View Citizen Generated Planning Priorities
From the First Public Meeting
- October 29, 2008

View Schematic Design Presentation
From the Second Public Meeting
- December 3, 2008
(Note: to preserve drawing legibility this is
a large pdf flie)

View Summary of Public Comments
From the Second Public Meeting
- December 3, 2008

View Phase II - Master Plan Options
On Thursday, May 21, 2009 the project team presented two Illustrative Master Plans to representatives of the Parks and Recreation Department as well as interested citizens.

The team recommended that a preliminary engineering study be conducted to determine the feasibility of restoring the pond located in the park before a final illustrative plan is prepared.

View Option 1 - Inline Pond Master Plan
View Option 2 - Offline Pond Master Plan